Description: Equinix will be conducting its annual maintenance of generator and associated fuel systems at the SY3 facility. Maintenance will be carried out one generator system at a time, ensuring continuous power availability and operational stability throughout the process.
Impact: Power: - Loads will remain on utility power throughout the maintenance. - UPS loads will continue to run on their primary protected source. - Redundancy will be reduced while each system is serviced.
Cooling: - No impact expected. Cooling redundancy will be fully maintained.
Mitigation measures: - All works will be performed on one generator system at a time. - No disruption to operational environments is anticipated.
Customer Action: No action is required from customers at this time. All work will be closely coordinated and monitored by Equinix and their approved vendors.