Monitoring - We have re-enabled the link between Equinix SY3 and Equinix PE2 after notice from the backhaul carrier advising capacity is now available. We will monitor the quality of the connection and close this status when we are satisfied that everything is stable.
Sep 13, 2024 - 14:07 AEST
Identified - We disabled a link between Equinix SY3 and Equinix PE2 due to intermittent connectivity issues with our backhaul service. Connectivity between NSW and WA is still operational, albeit with reduced redundancy and capacity.

We will monitor the situation and provide updates as available. If you are experiencing any issues or have any questions, please raise a case via the MySAU portal, or reach out to our support team via phone on +61 2 8115 8888

Sep 12, 2024 - 17:19 AEST
Regions Operational
90 days ago
99.98 % uptime
Today
Sydney Operational
90 days ago
100.0 % uptime
Today
Brisbane Operational
90 days ago
99.93 % uptime
Today
Melbourne Operational
90 days ago
100.0 % uptime
Today
Perth Operational
90 days ago
100.0 % uptime
Today
New Zealand Operational
90 days ago
99.97 % uptime
Today
Services Operational
90 days ago
99.98 % uptime
Today
Network Operational
90 days ago
99.98 % uptime
Today
Private Cloud Operational
90 days ago
100.0 % uptime
Today
Dedicated Servers Operational
90 days ago
99.97 % uptime
Today
Cloud Servers Operational
90 days ago
100.0 % uptime
Today
Firewall Operational
90 days ago
100.0 % uptime
Today
Colocation Operational
90 days ago
99.93 % uptime
Today
Spam Filter ? Operational
90 days ago
100.0 % uptime
Today
Managed Wordpress Operational
90 days ago
100.0 % uptime
Today
xDSL/EFM Operational
90 days ago
100.0 % uptime
Today
Network Storage ? Operational
90 days ago
100.0 % uptime
Today
Data Centres Operational
90 days ago
99.9 % uptime
Today
Equinix SY1 Operational
90 days ago
100.0 % uptime
Today
Equinix SY3 Operational
90 days ago
100.0 % uptime
Today
Equinix SY4 Operational
90 days ago
100.0 % uptime
Today
Equinix BR1 Operational
90 days ago
99.14 % uptime
Today
Equinix ME1 Operational
90 days ago
100.0 % uptime
Today
Equinix PE2 Operational
90 days ago
100.0 % uptime
Today
Vocus - Albany Operational
90 days ago
99.97 % uptime
Today
Syncom SYD2 Operational
90 days ago
100.0 % uptime
Today
NextDC B1 Operational
90 days ago
100.0 % uptime
Today
Service Desk Operational
90 days ago
100.0 % uptime
Today
MySAU Customer Portal Operational
Phone Support Operational
Servers Australia Monitoring Platform ? Operational
90 days ago
100.0 % uptime
Today
Servers Australia Website ? Operational
90 days ago
100.0 % uptime
Today
Operational
Degraded Performance
Partial Outage
Major Outage
Maintenance
Major outage
Partial outage
No downtime recorded on this day.
No data exists for this day.
had a major outage.
had a partial outage.
Scheduled Maintenance
Please be advised that during the maintenance window outlined below, Equinix will be conducting scheduled power maintenance at the Equinix BR1 facility. This maintenance will impact single-fed devices in all racks. We strongly recommend you review the following details carefully.

Maintenance Window:

  • Date: 28-OCT-2024

  • Local Time: Monday, 28-OCT, 05:00 - 17:00

  • UTC Time: Sunday, 27-OCT, 19:00 - Monday, 28-OCT, 07:00



Location:

  • Facility: Equinix BR1



Description of Work:
Equinix Facility staff and approved contractors will be shutting down PDU-1-1A and PDU-1-2A to perform Branch Circuit Monitoring upgrades. During this time, single-fed equipment will experience a loss of redundancy, as dual-powered devices will fail over to PDU-1-1B and PDU-1-2B, which remain UPS and Generator supported.

Equinix staff will monitor all alarms and conditions throughout the maintenance to ensure the integrity of the facility.

Maintenance Activity: Equinix Facility staff and approved contractors will be shutting down PDU-1-1A and PDU-1-2A to complete branch circuit monitoring upgrades.
Customer cabinets will have one feed isolated with dual supplied equipment failing over to PDU-1-1B and PDU-1-2B

Recommended Action:

  • Single Corded Devices: We recommend relocating these devices to PDU-1-1B and PDU-1-2B prior to the commencement of the maintenance to avoid disruption or installing an ATS/STS to keep your equipment online.

  • Dual-Powered Devices: These devices will automatically failover to the remaining active power feeds as long as they are connected to both A & B PDU rails.



Outage Duration: 12 Hours

Important Note: Please physically inspect the PDU rails in your racks to confirm the labels for rail A and rail B. Do not assume that rail A is always on the left side and rail B on the right side.

If you require an Automatic Transfer Switch (ATS) or Static Transfer Switch (STS) to maintain power to your single-fed devices, please refer to this document for a list of approved devices.

For any further assistance or queries regarding this maintenance, please contact our helpdesk by opening a case in the MySAU portal.

Posted on Sep 02, 2024 - 12:06 AEST
Please be advised that during the maintenance window outlined below, Equinix will be conducting scheduled power maintenance at the Equinix BR1 facility. This maintenance will impact single-fed devices in all racks. We strongly recommend you review the following details carefully.

Maintenance Window:

  • Date: 30-OCT-2024

  • Local Time: Wednesday, 30 OCT 05:00 - 17:00

  • UTC Time: Tuesday, 29 OCT, 19:00 - Wednesday, 30 OCT, 07:00



Location:

  • Facility: Equinix BR1



Description of Work:
Equinix Facility staff and approved contractors will be shutting down PDU-1-1B and PDU-1-2B to perform Branch Circuit Monitoring upgrades. During this time, single-fed equipment will experience a loss of redundancy, as dual-powered devices will fail over to PDU-1-1A and PDU-1-2A, which remain UPS and Generator supported.

Equinix staff will monitor all alarms and conditions throughout the maintenance to ensure the integrity of the facility.

Maintenance Activity: Equinix Facility staff and approved contractors will be shutting down PDU-1-1B and PDU-1-2B to complete branch circuit monitoring upgrades.
Customer cabinets will have one feed isolated with dual supplied equipment failing over to PDU-1-1A and PDU-1-2A.

Recommended Action:

  • Single Corded Devices: We recommend relocating these devices to PDU-1-1A and PDU-1-2A prior to the commencement of the maintenance to avoid disruption or installing an ATS/STS to keep your equipment online.

  • Dual-Powered Devices: These devices will automatically failover to the remaining active power feeds as long as they are connected to both A & B PDU rails.



Outage Duration: 12 Hours

Important Note: Please physically inspect the PDU rails in your racks to confirm the labels for rail A and rail B. Do not assume that rail A is always on the left side and rail B on the right side.

If you require an Automatic Transfer Switch (ATS) or Static Transfer Switch (STS) to maintain power to your single-fed devices, please refer to this document for a list of approved devices.

For any further assistance or queries regarding this maintenance, please contact our helpdesk by opening a case in the MySAU portal.

Posted on Sep 02, 2024 - 12:12 AEST
Past Incidents
Sep 15, 2024

No incidents reported today.

Sep 14, 2024

No incidents reported.

Sep 13, 2024
Resolved - Equinix IBX staff have reported that the KeyWatcher system has returned to normal operation following a data migration. Equinix BR1 staff have indicated that the root cause was an error resulting from a recent system update. This incident has now been resolved.
Sep 13, 12:04 AEST
Identified - We have been notified of issues with the KeyWatcher system at the Equinix BR1 facility that is resulting in delayed access to the site.

Please allow additional time for accessing your infrastructure while Equinix work on this issue with their vendor.

Sep 9, 09:46 AEST
Sep 12, 2024
Completed - The scheduled maintenance has been completed.
Sep 12, 05:00 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Sep 12, 01:00 AEST
Scheduled - Servers Australia engineers will be upgrading the Firmware on our FortiGate firewalls to the latest stable release. This will ensure the firewall cluster has the latest advancements, features, and security fixes available.

There may be a short interruption to services during the upgrade procedure.

Aug 30, 11:09 AEST
Sep 11, 2024

No incidents reported.

Sep 10, 2024

No incidents reported.

Sep 9, 2024
Sep 8, 2024

No incidents reported.

Sep 7, 2024

No incidents reported.

Sep 6, 2024

No incidents reported.

Sep 5, 2024

No incidents reported.

Sep 4, 2024

No incidents reported.

Sep 3, 2024

No incidents reported.

Sep 2, 2024
Completed - The scheduled maintenance has been completed.
Sep 2, 03:48 AEST
Update - Upgrades to infrastructure handling replications have been put on hold due to extended replication tasks currently completing. All replication jobs have been enabled and will run at their normal scheduled time moving forward.

This will be reviewed and a future date will be organised for replication infrastructure upgrades.

Sep 2, 03:48 AEST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Sep 2, 01:00 AEST
Scheduled - During the designated maintenance window, our system engineers will be conducting critical updates to the infrastructure controlling replications.

Service Impact:
Customers with replication services running on Private Cloud and HadraaS infrastructure should expect their replication services to stop for up to three hours. During this window replication jobs will be disabled for HadraaS and Private Cloud. All replication jobs will be enabled at the completion of the scope of work.

There is expected to be no production impact for customers, the maintenance window is for disaster recovery replication's only.

Need Help?
For any queries or additional support related to this maintenance, please do not hesitate to contact our support team by opening a case in the MySAU portal.

Aug 26, 16:21 AEST
Sep 1, 2024

No incidents reported.